20 Jul
20Jul

Started at 8:00 am at the office.

On site 8:15 am at H & E

 (Cable pulls in 207 & 216. Drew the tv dimensions to the wall. Leveled/centered on the wall. Drilled into steel studs, Hung/Mounted TV, ran 22.2 from 207 cache to 216 cache, terminated cables, pair tested, & prepped for commission)

Partnered With Link Integration Group

Comments
* The email will not be published on the website.